Antwerp-Berchem railway station in Voorst

Project Description

Antwerp-Berchem railway station received a new entrance in the form of a transparent bicycle shed.

The glass construction allows natural light to enter at every level. We provided the glass balustrade and railings. The lettering on the glass balustrade is designed so that the text can only be read from inside the shed. From outside, it looks abstract.

Project Details

Project: STVV football stadium
Location: Voorst
Architect: SNCB Holding
Client: Van Leare NV

Get in touch with us!

Are you interested in our glass balustrade solutions? Feel free to contact our specialists for advice and support.

The 5 certainties of SPARQ Glass balustrades

01

Sustainable &
recyclable

Cradle-to-cradle means that our balustrades are fully recyclable, with waste from one product being the raw material for the next. This promotes sustainability through re-use and minimises environmental damage.

02

Safe, functional
& aesthetic

SPARQ Balustrades' solutions go beyond fitting functional, safe fall protection. Aesthetics weigh as much as safety for us.

03

High-quality
materials

A beautiful building deserves a beautiful balustrade. Our goal is for you to realise the most beautiful buildings partly thanks to the quality solutions from SPARQ Balustrades.

04

Full
certified

SPARQ Balustrades is fully certified. All our balustrades comply with NEN standards. In addition, we meet the criteria set by the various European countries.

05

Spacious
stocks

Thanks to a product stock of at least 5,000 metres, we can start your project quickly.