Antwerp-Berchem railway station in Voorst
Project Description
Antwerp-Berchem railway station received a new entrance in the form of a transparent bicycle shed.
The glass construction allows natural light to enter at every level. We provided the glass balustrade and railings. The lettering on the glass balustrade is designed so that the text can only be read from inside the shed. From outside, it looks abstract.
Project Details
Project: STVV football stadium
Location: Voorst
Architect: SNCB Holding
Client: Van Leare NV
The 5 certainties of SPARQ Glass balustrades
01
Sustainable &
recyclable
Cradle-to-cradle means that our balustrades are fully recyclable, with waste from one product being the raw material for the next. This promotes sustainability through re-use and minimises environmental damage.
02
Safe, functional
& aesthetic
SPARQ Balustrades' solutions go beyond fitting functional, safe fall protection. Aesthetics weigh as much as safety for us.
03
High-quality
materials
A beautiful building deserves a beautiful balustrade. Our goal is for you to realise the most beautiful buildings partly thanks to the quality solutions from SPARQ Balustrades.
04
Full
certified
SPARQ Balustrades is fully certified. All our balustrades comply with NEN standards. In addition, we meet the criteria set by the various European countries.
05
Spacious
stocks
Thanks to a product stock of at least 5,000 metres, we can start your project quickly.